Office Baroque
1977
Intervention
Materials:
Ernest van Dijckkaai 1, Antwerp
Antwerp was the headquarters of the sea shipping company and will be the site of an Antwerp Hilton. After being obliged to make a major changes in the original project, the work was done totally internally using all five floors and the roof. For the first time it was possible to orchestrate a multy leved structure using two circular arches that modulate the space as the shape and size of rooms change up through the building. The result is a series arabesque slices opening whole building to a ever changing promenade of views internal views.